Nachricht senden

products details

Created with Pixso. Zu Hause Created with Pixso. Produits Created with Pixso.
Sonnensystem-Komponenten
Created with Pixso.

500~2500mm Length Ground Mounting Screw Pile Driving Rack

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Brand Name: TIANFON
Model Number: Grundschrauben-Stapel
MOQ: Satz 5
Preis: USD800-2000/set
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 30MW/month
Detail Information
Herkunftsort:
CHINA
Zertifizierung:
SGS,ISO 9001,ISO 14001,OHSAS 18000
Installieren Sie Standort:
Alle Bodenart
Material:
Stahl Q235B
Durchmesser:
76 mm~200 Millimeter
Stärke:
3~3.5mm
Rostfest:
Erstklassiges heißes Bad galvanisierte
Länge:
500~2500 Millimeter
Verpackung Informationen:
Standardexportverpackung
Versorgungsmaterial-Fähigkeit:
30MW/month
Hervorheben:

2500mm Ground Mounting Screw Pile

,

500mm Ground Mounting Screw Pile

Product Description

500~2500mm Length Customize Design Ground Mounting Screw Pile Driving Rack

 

Ground Screw Piles is the preferred foundation in many applications, such as Photovoltaic Solar Farm construction, Timber-frame Housing, Timber Decking, Street Light and Fence construction, Temporary Site Accommodation, Bill Board/Advertising Signs and many more applications.

 

Specifications:

 

Name

Size(mm)

Thickness(mm)

Material

Surface treatment

Photo

Piles with flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 0

Piles without flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 1

Steel pipe piles

φ 76/89,1000-2000mm(Length)

4

Q236B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 2

 

Products can be customized according to customer requirement.

 

Features:

 

Are cost effective

 

Can be installed through ground water without casing

 

☀ Can be removed for temporary applications

 

☀ Are easily transported to remote sites

 

Typically required less time to install

 

☀ Torque is a strong verification of capacity

 

Reduce the number of truck trips to a site

 

Eliminate concrete curing and formwork

 

☀ Can be installed at a better angle for added laterial risistance

 

☀ Can be installed with smaller more accessible equipment

 

☀ Are installed with low noise and minimal vibrations

 

☀ Can be galvanized for corrosion resistance

 

☀ Minimize disturbance to environmentally sensitive sites

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 3

 

Packaging and delivery:

 

► Port: Tianjin, Shanghai, Qingdao

 

► Package: strong and long distance transportation package

 

► Payment Terms: L/C,D/A,D/P,T/T

 

► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 4

 

Our Certificates:

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 5

500~2500mm Length Ground Mounting Screw Pile Driving Rack 6